Terminasi
| No. | ITEM PEKERJAAN | SATUAN | HARGA |
|---|---|---|---|
| 1 | Panel Cubicle “OUTGOING PLN” | titik | Rp 13.368.377 |
| 2 | Panel Cubicle “INCOMING KONSUMEN” | titik | Rp 13.368.377 |
| 3 | Panel Cubicle “OUTGOING KONSUMEN” | titik | Rp 13.368.377 |
| 4 | Sisi Primer “HV TRAFO” | titik | Rp 13.368.377 |
| 5 | Mobile Socket 3P 63A | pcs | Rp 6.667.106 |
| 6 | Mobile Socket 3P 32A | pcs | Rp 3.143.797 |
| 7 | Mobile Socket 3P 16A | pcs | Rp 1.905.120 |
| 8 | Accessories (cabling system) | lot | Rp 31.225.294 |
| 9 | Fire Stop Protection (cabling system) | titik | Rp 10.883.236 |